Site meeting minutes that show what changed, and who said so

Acta is an AI meeting assistant for construction companies that run several sites with a small office team. It records site progress meetings with the client and PMC, subcontractor coordination and billing reviews, then writes who owns each task and by when, which decisions were made or changed, and which risks came up. Project managers can later ask which drawing revision was agreed, and see the meeting it came from.

Updated by the Acta team

The meetings that run construction contractors

Who is in the room, and what slips when nobody writes it down.

Weekly site progress meeting with client and PMC

Project manager, site engineer, client representative, architect or PMC

Instructions given verbally, like a changed door schedule or a hold on a slab, reach the site late or not at all.

Subcontractor coordination meeting

Site engineer, MEP, shuttering, waterproofing and finishing subcontractors

Each subcontractor leaves with a different idea of the sequence, so one crew waits on another.

RA bill and measurement review

QS, project manager, client's engineer

Quantities disputed in the meeting and the agreed basis for extra items are not written down, so the next bill reopens them.

Material planning meeting

Purchase, stores, site engineer

Steel and RMC orders promised for a pour date slip without anyone noticing until the day.

Templates that fit

Turn on these built-in report templates and Acta writes the report after each matching meeting.

See all report templates

Custom template

Site progress minutes

  1. 1.Progress by block or floorTable
  2. 2.Client and PMC instructionsBullets
  3. 3.RFIs and drawing revisions discussedTable
  4. 4.Hindrances and their causeBullets
  5. 5.Actions before next meetingChecklist
  6. 6.Safety observationsBullets

An example of a template you can build yourself. Custom templates are part of the paid plans.

An example

Example

The staircase that changed twice

Example only: a contractor building a three-storey school block outside Nashik. In the weekly site progress meeting, the architect confirms a wider staircase on drawing revision R3. Two weeks later, on a short call with the client, the width goes back to the R2 design to save a classroom wall. The site engineer only attended the first meeting. Because both were recorded, the Decision log shows "Staircase width as per R3" as Changed, with the old statement under "Was:" and both meeting moments in its History. The project manager sees it before shuttering starts, sends the site the R2 details, and asks the architect to issue the drawing formally. The formwork is set once.

What Acta keeps from it

Action items

  • Get formal R2 staircase drawing issued by architectProject manager · due Wed 25 NovOpen
  • Submit measurement sheet for extra excavation in block BSuresh (QS) · due Tue 17 NovOverdue
  • Confirm RMC slot for second-floor slab pourStores in-charge · due Fri 20 NovDone

Decision log

  • Staircase width as per drawing R3Decided by Client and architectChanged
  • Waterproofing starts after plumbing sleeves are fixed, not beforeDecided by Project managerActive

Risk Registry

  • Second-floor pour delayed if steel delivery slips againHighMitigating

    Owner: Purchase · Mitigation: Part delivery from a local stockist agreed

  • Extra items not approved in writing by clientMediumOpen

    Owner: Suresh (QS) · Mitigation: Send variation list for sign-off with next RA bill

OneChat

Which drawing revisions did the client change verbally this month?

Staircase back to R2, and the canteen window size reduced (Site progress meeting, 4 Nov; client call, 18 Nov).

What did the plumbing subcontractor promise for block B?

Sleeves fixed on all floors by 21 Nov, before waterproofing (Subcontractor coordination meeting, 14 Nov).

Each person's Outcomes and Risk Registry are built from the meetings they record or that are shared with them.

Make it run itself with Agent Builder (beta)

Weekly list of changed instructions for the client

Starts: On a schedule: every Saturday at 5 pm

  1. 1Acta data: decisions marked Changed or Reversed this week, from meetings with "site" in the title
  2. 2AI: write each as old instruction, new instruction, date and who gave it
  3. 3Human approval: the project manager checks the wording
  4. 4Gmail: email the list to the client's PMC

Approval: The project manager approves before the email leaves; rejected or unanswered runs send nothing.

Result: Verbal changes get confirmed in writing every week, which helps at billing time. Built with Agent Builder (beta).

How Agent Builder works

Rolling it out

  • Project managers and the QS join the workspace first, one seat each; site engineers either join with their own seat to read shared meetings or get their site tasks by the daily follow-up email.
  • Site meetings in a portacabin are recorded on the mobile app; client calls through the notetaker bot or desktop app.
  • Share each site's progress meetings with everyone in the workspace so the office, purchase and billing can ask OneChat.
  • Every recorder keeps their own construction decision log and Risk Registry built from their meetings; plan who records which site.

Questions from construction contractors

How do I take site progress meeting minutes without a minute-taker?

Put a phone on the table and record with the Acta mobile app, or use Record audio in a browser. After the meeting Acta writes a summary, decisions, action items with owners and dates, and any template you turned on, such as Project status. You edit names or dates if needed and share the meeting.

Can Acta help with RFI and drawing revision tracking?

It tracks what people say about them. When a revision is agreed, changed or reversed in a meeting, the Decision log records it with the date and a link to the moment. It does not read your drawings or replace a document register, so keep issuing revisions formally.

Does it work for a subcontractor coordination meeting with ten people talking?

Yes, though clear speech helps, so ask people not to talk over each other on key points. Acta writes each action item with the owner named in the discussion. Where it cannot tell who took a task, it shows "Unassigned" so the site engineer can pick the right person, rather than guessing.

Can the client see our internal meetings?

Only if you share them. Meetings are private to the person who recorded them by default, and sharing goes to people in your own Acta workspace, not to outsiders. Recordings are encrypted in transit and at rest, and Acta says it does not open your recordings or sell your data.

What does Acta cost a contractor?

You pay for each person in your workspace: Pro is $8 per seat a month or $72 per seat a year, or ₹699 a month in India. A firm that adds five project managers to its workspace would need five seats. There is a 15-day free trial to test it on a live site.

Try it on your next meeting.

Free for 15 days. After that, each person in your workspace uses one seat, and the workspace owner pays for seats.